Tomahawk System

MAINS PREPARATION & INSPECTION

Panton McLeod & Envirologics Engineering Inc. are excited to be providing the Tomahawk System to the UK & Ireland, supporting superior mains rehab and inspection.

Tomahawk™ System Cleaning

The Tomahawk™ System can help you on your pipeline rehabilitation project.

  • Improves drinking water quality
  • Restores hydraulic capacity of pipes
  • Lowers operating costs for distribution networks

Key Advantages – Fast, Dry, Bonded

  • Dust-free, environmentally friendly, trenchless process
  • Uses little to no water, reducing waste by up to 98%
  • Quickly removes tuberculation, biofilms, old bitumen or coal tar linings
  • Best-in-class surface preparation for superior bond and long-term, leak-free performance
  • Dries the pipe for immediate liner application
  • Visit the Envirologics Engineering Inc. website for more detailed information

Proven Capability

  • 100mm (4”) to 300mm (12”) diameter pipe
  • Clean up to 135m (450 feet)
  • Up to 40% tuberculation levels
  • One 22.5° elbow per segment
  • Meets or exceeds surface preparation and bond requirements for ASTM F3182 for SIPP applications

Tomahawk Scout™ Inspection

The Tomahawk Scout™ not only provides live feedback on cleaning progress but it also targets the cleaning action and draws out moisture from traditionally troublesome areas.

  • Real time feedback on progress
  • Vaculates pooled water and debris
  • Watch a video of the Scout™ in action

For more information download :

Whether you represent a water company or a supply chain partner please get in touch to discuss how the Tomahawk™ System can improve cleaning and inspection standards, reduce waste and provide long term leak-free performance for any CIPP or SIPP lining system.

Contact iain.weir@pantonmcleod.co.uk

Copyright 2016 Panton McLeod. All rights reserved. Panton McLeod Americas Logo